1.5 MG Reservoir Design
City of Colton, CA
JBA was retained by the City of Colton for the complete design and engineering of a 1.5 million gallon (MG) water reservoir in the Reche Canyon area, including the
design of the reservoir pump station and all appurtenances.
As part of the project, JBA performed all necessary field topography of the proposed reservoir site, as well as all Plans, Specifications, and Estimates (PS&E).
Key Project Staff
Joseph S.C. Bonadiman, P.E. – Project Engineer
Edward J. Bonadiman, P.L.S. – Survey Manager
Dennis W. Jackson, P.E. – Senior Water Resources Engineer